Resinfix were asked to inject grout voids under an energy turbine base to ensure its bond to the underlying concrete structure. This was carried out by injecting and gravity feeding the grout into the hidden void through long drill holes driven externally. We then picked the correct resin to ensure full penetration. The void was injected from all sides under pressure to ensure 100% filling of the voids with an 80N/mm2 grout.
Resin injection voids